Wyma Solutions Case Studies

Onion producer redevelops its post-harvest operations

06 May, 2025 | Wyma Solutions

Recognising a need to improve the efficiency of its post-harvest operations whilst maintaining the quality, Dolling Produce engaged Wyma Solutions to redevelop its pack-house solution

Carrot wash line processes 40 tons per hour

05 May, 2025 | Wyma Solutions

The Lamattina carrot wash line processes 40 tons per hour (with a capability up to 60 tons per hour if required).

In-house ginger processing for beverage maker

17 April, 2025 | Wyma Solutions

A ginger beer manufacturer reduces its supply risk by investing in pack-house technology to process its own ginger for brewing the drinks.

Parsnip automation project optimises operational efficiency

25 March, 2025 | Wyma Solutions

Faced with increasing difficulty sourcing labour, Frederick Hiam partnered with Wyma Solutions to automate its parsnip processing operations in a two-phase project.

  • All content Copyright © 2025 Westwick-Farrow Pty Ltd